52词语>英语词典>overburden翻译和用法

overburden

英 [ˌəʊvəˈbɜːdn]

美 [ˌoʊvərˈbɜːrdn]

v.  使负担过重

过去分词:overburdened 过去式:overburdened 现在分词:overburdening 第三人称单数:overburdens 

TOEFL经济

BNC.20075 / COCA.20715

牛津词典

    verb

    • 使负担过重
      to give sb/sth more work, worry, etc. than they can deal with

      英英释义

      noun

      • an excessive burden
          Synonym:overload
        1. the surface soil that must be moved away to get at coal seams and mineral deposits

          verb

          • burden with too much work or responsibility
            1. load with excessive weight

              双语例句

              • Of the pressures, the one caused by the weight of overlying sediments, we call it overburden pressure, is the most obvious.
                在这两种压力之中,由上覆沉积物重量造成的压力最为明显,我们称这种压力为上覆压力。
              • Study of mechanism of stope water inrush caused by water accumulation in overburden separation areas
                覆岩离层区积水引发的采场突水机制研究
              • But on the other hand, it turns out to overburden the food supply of the world.
                但另一方面,它给世界带来了沉重的粮食负担。
              • Application of radioisotope logging technique to the testing of the coefficient of permeability in the overburden layers of riverbed
                放射性同位素测井技术在河床覆盖层渗透系数测试中的应用
              • Numerical Analysis for Influence of Anti-seepage Measure of Deep Overburden Foundation on Seepage Field
                深覆盖层地基防渗措施对渗流场影响数值分析
              • The deep overburden will also appear horizontal displacement to upper and down streams after dam construction.
                受坝体的影响,坝基深厚覆盖层也会向上、下游发生水平位移;
              • This paper introduces the successful freezing technology and construction experience of Dingji air shaft sinking in thick overburden.
                介绍丁集风井深厚表土层的冻结技术及施工的成功经验。
              • Dynamic Analysis of Asphalt Concrete Core Rockfill Dams on Deep Overburden
                深覆盖层上沥青混凝土心墙堆石坝动力分析
              • Application of Comprehensive Geophysical Method to Deep Overburden Layer Exploration in River Bed
                综合物探方法在河床深厚覆盖层勘探中的应用
              • Study on Debris Flow Forming Reasons in Overburden Layer During Transition Mining from Open Pit Mine to Underground Mine The oil workers drilled down another 10 feet to find oil.
                露天转地下开采覆盖层形成泥石流原因的研究在地下打洞石油工人为了开采石油又往下钻了10英尺。